Welcome, Guest
Username: Password: Remember me
  • Page:
  • 1

TOPIC:

Flooding Main Control 1 week before OPPE 23 years 6 months ago #14359

  • David Melges
  • David Melges's Avatar Topic Author
  • Visitor
  • Visitor
I remember a duty night when the crew was rudely awakened because Main Control was flooding. We were about a week before OPPE and the ship yard and several outside contractors had to repair several motors and generators to get us through it.

As I recall the water was above the lower level deck plates when discovered. I also remember alot of eductor use training after that.

Please Log in or Create an account to join the conversation.

  • Page:
  • 1
Time to create page: 0.224 seconds